- 49
- Projects
- 39
- Ongoing
- 8
- Completed
- USD 36.471.043
- Contract value
Road conditions
No active alerts.
Projects in this municipality
- Supervision Consultant for Construction of Intersection in the Existing Dili - Liquica Road to Connect Access Road from Tibar Bay Port (National Road - A03) Sta. 0+000 - Sta. 0+620 Studies and design · Lelo Engineering Unipessoal Lda Completed
- R4D Rural Road Spot Improvement Aibenu - Asumanu - Leurema Chainage 5+000-10+000, Liquica Municipality Roads · Caiulu Unipessoal Lda Completed
- R4D Rural Road Spot Improvement Fahilebo - Bucumera Chainage 3+000+6+500) Liquica Municipality Roads · TM CAILEBA UNIPESSOAL LDA Completed
- Renovacao de Casa de Recuperasaun da Saude para pessoas com HIV, Tibar, Liquica, Timor Leste · K Three Timorinsia Lda Completed
- R4D Rural Roads Periodic Maintenance: Aibeno-Asumanu-Leurema Chainage 0+000 - 10+000, Dato-Loidahar Chainage 0+000 - 12+300, Berlakuidu-Laberlaka Chainage 0+000 - 5+400 Roads · CLARIDADE UNIPESSOAL LDA Completed
- R4D Rural Road Spot Improvement Gunaba - Lukulai Chainage 0+000-2+000 Roads · CRAELEKI BERCOLI UNIPESSOAL LDA Completed
- R4D Rural Roads Periodic Maintenance: Barcau - Maubaralisa Chainage 0+000 - 12+500, Nunuleta - Darulema Chainage 0+000 - 2+000 Roads · NHEU UNIPESSOAL LDA Completed
- R4D Rural Roads Periodic Maintenance: Metagou-Aibenu Chainage 0+000 - 7+600, Taltabi-Kutulau Chainage 0+000 - 1+700 Roads · Prudencia Construction Unip Lda Completed
- New Installation MV,LV Line and House Connection for Bazartete Vila to Leorema -Bazartete Sub District-Liquica District Flood control · Mina petro leste Lda Not started
- Addt. Poste liga Maubara Electricity · Fu Unip,Lda Not started
- Road Network Upgrading Project ( Additional Financing ) - Construction Supervision for the Upgrading and Maintenance of Baucau to Lautem, Maubara to Karimbala and Atabae to Mota Ain Roads Studies and design · DONGSUNG ENGIEERING CO., Ltd (Republic of Korea) Ongoing
- Engineering Procurement Construction-Design, Suplly, Installation, Testing and Commisioning Extension Transformer Bay Of The Existing 150/20KV Liquica Substation to Suplly Power to Tibar Bay Port Studies and design · China Shandong International Economic Ongoing