Construction of the Cyclopic Protection Wall on the Left Side & Right Side of the Ailok Laran River, Hera. Sta 0+070-1+016.50 (Alignment 1 Left Side & Right Side.) Sta 0+000-0+264.74 50 (Alignment 2 Left Side & Right Side) in Dili Municipality
Ongoing
- Contract no.
- SSS/077/MOP-2025
- Contractor
- Satelite Holding e Diversos Unipessoal Lda
- Contract value
- USD 3.585.994,07
- Sector
- Flood control
- Category
- Emerjénsia
- Municipality
- Dili
- Owner
- Direcao Nacional de Prevencao e Controlo de Cheias
- Funding source
- Fundu Infraestrutura (FI)
- Year
- 2025
- Start date
- 26 June 2025
- End date
- 26 December 2025
Data source: SIGP — Project Management Information System. Last updated: 9 October 2026