Consulting Service for Preparation of DED and Bidding Document for New Bridges and River Trainings (Package/TOR No. 03) for: PACKAGE I: New Bridges Lumutu-Ermera, Letefoho Sare-Ermera-Hatulia, Liquica & PACKAGE II: River Training (Bridge Protection) Existing Bridges Karau Ulun Highway- Suai, Bunetil Highway-Suai, Mola Highway-Suai, Nabuk Highway-Suai, Leomea Highway Bridge-Suai, and Leomea-Nationa
Ongoing
Progress70%
- Contract no.
- MOP-CS-230019
- Contractor
- Jonarear Multiline, Unipessoal Lda (Timor-Leste)
- Contract value
- USD 730.100,00
- Sector
- Studies and design
- Category
- EST
- Owner
- Direcao Nacional de Prevencao e Controlo de Cheias
- Funding source
- Liña Ministeriál (LM)
- Year
- 2022
- Start date
- 5 April 2023
- End date
- 30 June 2025
Data source: SIGP — Project Management Information System. Last updated: 9 October 2026
Without coordinates