Emergency Project Wall Protection in Raimea, Acanuno-Hera Lot 1 Sta. 0+000 to 0+302 (0.32KM), Lot 2 Sta. 0+000-0+110 (0.11KM) Lot 3 0+000-0+056 (0.056KM) and Lot 4 0+000-0+190 (0.19KM), Raimea, Acanuno, Suco Hera, Posto Adm. Cristo Rei, Municipio Dili
Ongoing
- Sector
- Roads
- Category
- Konstrusaun jerál
- Owner
- Gabinete DGEPPCC
- Funding source
- Liña Ministeriál (LM)
- Year
- 2025
- Start date
- 29 August 2025