Installation of Wave Breaker (Concrete) to Protect Abutment Bridge & Regularization at Lomea River, Suco Tasihilin, Posto Administrativo Zumalai, Municipio Covalima.

Ongoing
Contract no.
MPW-W-230028
Contractor
Fortuna Star Unip Lda
Contract value
USD 96.696,20
Sector
Flood control
Category
Emerjénsia
Municipality
Covalima
Owner
Direcao Nacional de Prevencao e Controlo de Cheias
Funding source
Liña Ministeriál (LM)
Year
2023
Start date
10 May 2023
End date
31 December 2023

Data source: SIGP — Project Management Information System. Last updated: 9 October 2026