Installation T-Beam Concrete Reinforcement (Bridge) with Cyclope at Turon River, Aldeia Lapuro, Suco Babulu, Posto Adm. Same Vila, Municipio Manufahi

Ongoing
Progress0%
Contract no.
MOP-EO-25050
Contractor
My FRIEND CONSTRUCTION, UNIPESSOAL,LDA
Contract value
USD 342.108,21
Sector
Flood control
Category
Emerjénsia
Municipality
Manufahi, Same, Betano, Lapuro
Owner
Direcao Nacional de Prevencao e Controlo de Cheias
Funding source
Liña Ministeriál (LM)
Year
2025
Start date
17 March 2025
End date
26 October 2025

Data source: SIGP — Project Management Information System. Last updated: 9 October 2026