Skip to main content

Project list

Contracted projects under way in Timor-Leste

84 results

Project list
ProjectMunicipality SectorContractor StatusProgress
Obra Muru Protesaun Mota Fatumoli. Package II Right Side Profile Type II & Type IV (Sta. 0+000 - Sta. 0+213 & Sta. 0+000 - Sta. 0+097) MPW-W-240048 — 2023 Bobonaro Flood control Anjo Berat Nabilan Unip.Lda Ongoing —
Provision of Consultancy Service for Preparation of Detailed Engineering Design (DED) and Bidding Documents for Rehabilitation of National Road: Maliana - Cailaco - Marobo Bridge (26 KM) Bobonaro Municipality (ICB-CS-MOP-22007) MPW-CS-230053 — 2023 Bobonaro Studies and design PT. Wiratman (Indonesia); JKC Consultant Engineering Unipessoal.,Lda Completed —
R4D Rural Road Rehabilitation Of Atabae-Rairobo Road Package 2 Chainage 4+000-6+000 (2KM), Bobonaro Municipality RT/093/MOP-2022 — 2023 Bobonaro Flood control CLH Junino Unipessoal, Lda Ongoing —
R4D Rural Road Rehabilitation Of Atabae-Rairobo Road Package 3 Chainage 6+000-8+000 (2.0 KM), Bobonaro Municipality RT/094/MOP-2022 — 2023 Bobonaro Flood control Junnedy Unipessoal, Lda Ongoing 35%
R4D Rural Road Rehabilitation Of Atabae-Rairobo Road Package 6 Chainage 14+000-16+000 (2.0 KM), Bobonaro Municipality RT/098/MOP-2022 — 2023 Bobonaro Flood control Barver, Unipessoal Lda Completed —
R4D Rural Road Rehabilitation of Atabae-Rairobo-Parmaten - Hatas, Bobonaro chainage 12+000 - 14+000 RT/097/MOP-2022 — 2023 Bobonaro Flood control Aumakua G.G. Unip.Lda JV Hugo Amor Unip.Lda Ongoing —
R4D Rural Roads Atabae Rairobo-Road Package 9 Chainage 18+000 - 20+000 Bobonaro Municipality RT/100/MOP-2022 — 2023 Bobonaro Flood control Dupas Unip. Lda Ongoing —
Rehabilitasaun R4D Rural Road Atabae-Rairobo Package 8 Chainage 16+000 - 18+000, Bobonaro Municipality RT/099/MOP-2022 — 2023 Bobonaro Flood control Irmao Sandobe Unip. Lda Ongoing —
Rehabilitasaun Estrada Rural Aldea Raeluli-postu UPF Has Naruk, Chainage 0+000-4+000,Suco Cowa, Posto Adm. Balibo, Municipio Bobonaro MPW-W-240061 — 2023 Bobonaro Roads Jevikima Unip. Lda Ongoing —
Rehabilitasaun estrada Rural Cailaco Villa - Suku Goulolo Chainage 0+000 - 2+080, Suco Hatudara, Posto Adm.Cailaco, Municipio Bobonaro MPW-W-240062 — 2023 Bobonaro Roads Afnadan Unip.Lda JV Manu Bey Unip.Lda Ongoing 16%
Rehabilitasaun estrada Rural Daudo - Genulai, Chainage 0+000 - 4+400 Km, Suco Daudo/Genulai, Posto Adm. Cailaco, Municipio Bobonaro MPW-W-240068 — 2023 Bobonaro Roads TANSOS UNIP,LDA Ongoing —
Rehabilitasaun estrada Rural Gole -Tepa - Gudataz 0+000 - 5+700 Km, Suco Daudet -Opa-Guda,Posto Adm.Lolotoe, Municipio Bobonaro MPW-W-240067 — 2023 Bobonaro Roads Idele Construction Unip.Lda Ongoing —
Rehabilitasaun estrada Rural Halimesak - Lourvia Chainage 0+000 - 3+000 Km, Suco Lourvia, Posto Adm.Cailaco, Municipio Bobonaro MPW-W-240066 — 2023 Bobonaro Roads Dolivaria Unip.Lda JV Novalo Unip.Lda Ongoing 5%
Rehabilitasaun Estrada Rural Lourba- Bobonaro Chainage 0+000-2+000 Km, Suco Lourba, Posto Adm.Bobonaro, Municipio Bobonaro MPW-W-240063 — 2023 Bobonaro Roads Mamtetu TunivaUnip.Lda Ongoing —
Rehabilitasaun estrada Rural Railulik Postu UPF Has Naruk Chainage 4+000+6+750 Km, Suco Cowa, Posto Adm. Balibo, Municipio Bobonaro MPW-W-240069 — 2023 Bobonaro Roads Sigo, Unip.Lda Ongoing 10%