Obra Konstrusaun Moru Protesaun (Cyclope Left Side & Right Side, Box Culvert), Pakote I iha Mota Beduku (Turleu), Cyclope L/S Sta. 0+100 - 0+280, Cyclope R/S Sta. 0+000 - 0+280, Aldeia Turleu, Suco Tibar, Postu Adm. Bazartete, Municipio Liquiça
Ongoing
- Contract no.
- MOP-EO-25098
- Contractor
- KThree Timorinsia, Lda
- Contract value
- USD 499.433,88
- Sector
- Flood control
- Category
- Emerjénsia
- Municipality
- Liquiçá, Bazartete, Tibar, Turleu
- Owner
- Direcao Nacional de Prevencao e Controlo de Cheias
- Funding source
- Liña Ministeriál (LM)
- Year
- 2025
- Start date
- 7 April 2025
- End date
- 7 April 2026
Data source: SIGP — Project Management Information System. Last updated: 9 October 2026