Obra Recoperacao Projeto Calamidade " Cross Drain, Rotunda Nicolau Lobatu (RCBC Sta. 0+000 - 0+078 & Catch Basins Stone Massonry, RCPC to connect to Existing Line Drain Sta. 0+078-0+098 Supply and Instal Drainage Gutter Sta, 0+000-0+033" Dili Municipality
Completed
Progress89%
- Contract no.
- MPW-W-230035
- Contractor
- Novalo Unip Lda
- Contract value
- USD 118.049,96
- Sector
- Flood control
- Category
- Emerjénsia
- Municipality
- Dili
- Owner
- Direcao Nacional de Prevencao e Controlo de Cheias
- Funding source
- Liña Ministeriál (LM)
- Year
- 2023
- Start date
- 30 May 2023
- End date
- 30 September 2023