Skip to main content

Provision of Consulting Services for Preparation of Detailed Engineering Design (DED) for New Bridges and River Training, Package I: New Bridge Lutumutu-Ermera, Letefoho Sare-Hatulia, Liquica & Package II: River Training (Bridge Protection) Existing Bridge Karau Ulun Highway-Suai, Bunetil, Highway-Suai, Mola Highway-Suai, Nabuk Highway-Suai, Loumea Highway Bridge Suai, and Loumea-National, Suai, C

Ongoing
Contract no.
MPW-CS-230019
Contractor
Jonarear Multiline, Unipessoal Lda (Timor-Leste)
Contract value
USD 730.100,00
Sector
Studies and design
Category
Konstrusaun jerál
Funding source
Liña Ministeriál (LM)
Year
2023
Start date
5 April 2023
End date
5 December 2023

Data source: SIGP — Project Management Information System. Last updated: 9 October 2026

Without coordinates

Community observations

Have you seen these works? Send an observation or photo about progress. MOP checks before publishing.