Provision of Consulting Services for Preparation of Detailed Engineering Design (DED) for New Bridges and River Training, Package I: New Bridge Lutumutu-Ermera, Letefoho Sare-Hatulia, Liquica & Package II: River Training (Bridge Protection) Existing Bridge Karau Ulun Highway-Suai, Bunetil, Highway-Suai, Mola Highway-Suai, Nabuk Highway-Suai, Loumea Highway Bridge Suai, and Loumea-National, Suai, C
Ongoing
- Contract no.
- MPW-CS-230019
- Contractor
- Jonarear Multiline, Unipessoal Lda (Timor-Leste)
- Contract value
- USD 730.100,00
- Sector
- Studies and design
- Category
- Konstrusaun jerál
- Funding source
- Liña Ministeriál (LM)
- Year
- 2023
- Start date
- 5 April 2023
- End date
- 5 December 2023
Data source: SIGP — Project Management Information System. Last updated: 9 October 2026
Without coordinates
Community observations
Have you seen these works? Send an observation or photo about progress. MOP checks before publishing.
