Provision of Consulting Services for Preparation of Detailed Engineering Design (DED) for New Bridges and River Training, Package/TOR No.2 Package I: New Bridges for Laclo Vila-Manatuto, Bemori-Dili, and Welolo (Existing Bridge) in Viqueque. Package II: River Training (Bridge Protection Structure) for Vemasse Bridge-Baucau, Wekain Bridge-Viqueque, Irabere Bridge-Viqueque and Dilor Bridge-Viqueque
Ongoing
Progress70%
- Contract no.
- MPW-CS-230001
- Contractor
- JENETBI GUMER UNIPESSOAL, LDA
- Contract value
- USD 800.511,25
- Sector
- Studies and design
- Category
- EST
- Owner
- Direcao Nacional de Prevencao e Controlo de Cheias
- Funding source
- Liña Ministeriál (LM)
- Year
- 2022
- Start date
- 28 December 2022
- End date
- 27 August 2023
Data source: SIGP — Project Management Information System. Last updated: 9 October 2026