Realization of the Enginering Design (DED)-included the preparation of Feasibility Study of the University of City of Aileu
Ongoing
Progress54%
- Contract no.
- MPW-S-20024
- Contractor
- Bernabad Arquirectura SLP Lda.
- Contract value
- USD 475.000,00
- Sector
- Studies and design
- Category
- EST
- Municipality
- Aileu
- Owner
- Gabinete DGHU
- Funding source
- Liña Ministeriál (LM)
- Year
- 2019
- Start date
- 31 March 2020
- End date
- 23 April 2023
Data source: SIGP — Project Management Information System. Last updated: 9 October 2026
Without coordinates
Community observations
Have you seen these works? Send an observation or photo about progress. MOP checks before publishing.