Supply of Gabion Wire for River Protection for Prevention & Maintenance Project for 12 Municipalities.
Ongoing
Progress94%
- Contract no.
- MPW-GS-220179
- Contractor
- Ladiza Adiza JT Unip. Lda.
- Contract value
- USD 305.745,00
- Sector
- Flood control
- Category
- Emerjénsia
- Owner
- Direcao Nacional de Prevencao e Controlo de Cheias
- Funding source
- Liña Ministeriál (LM)
- Year
- 2022
- Start date
- 27 September 2023
- End date
- 31 December 2023
Data source: SIGP — Project Management Information System. Last updated: 9 October 2026
Without coordinates
Community observations
Have you seen these works? Send an observation or photo about progress. MOP checks before publishing.
