Saltar para o conteúdo

Lista de projetos

Projetos com contrato em curso em Timor-Leste

769 resultados

Lista de projetos
ProjetoMunicípio SetorEmpreiteiro EstadoProgresso
Emergency Project for Construction of retaining Wall, Sta. 0+000 - Sta. 0+500 Suco Manleuna Aldeia Lesbutak Posto Adm. Dom Aleixo, Municipality Dili SSS/069/MOP-2024 — 2024 Dili Controlo de cheias Hedge Construction, Unip. Lda Em curso 76%
Emergency Project for Protection Camanassa Bridge SSS/033/MOP-2024 — 2024 Covalima Pontes JUFADO, UNIPESSOAL, LDA Em curso 100%
Emergency Project for Protection of Haemanu Bridge SSS/052/MOP-2024 — 2024 Covalima Pontes Maun Alin Suai Unip Lda Em curso 56%
Emergency Project of Cyclop in Cairui - Laleia Pagkage I Sta. 0+000 - 1+200 MPW007 — 2024 Manatuto — We'coi Unipessoal Lda Em curso 61%
Emergency Project of Cyclope in Cairui River Sta. 1+300 - Sta. 2+413.73 (Package 2) Manatuto Municipality SSS/121/MOP-2024 — 2024 Manatuto Controlo de cheias Dyanyl Unipessoal, Lda Em curso 31%
Emergency Project of Regularization Casa River in Ainaro-Casa, Ainaro Municipality, Start from Sta 1+325.00 - Sta 2+330.00) Package II MPW-W-240103 — 2024 Ainaro Controlo de cheias Assui Caebao Unipessoal, Lda Em curso 100%
Emergency proposed for the new construction of bridge with retaining wall in Area Wee Kakau Oan 1 SSS/017/MOP-2024 — 2024 Manufahi Pontes Alkafer .Lda Em curso 72%
Emergency Proposed Project "Bekora Up Stream" (Sta. 0+000 - Sta. 0+900) Becora, Dili MPW-W-240142 — 2024 — Controlo de cheias Fortuna Star Unip Lda Em curso 45%
Emergency River Normalization & Gabion Construction in Tibar Sta. 0+000 to Sta. 1+100 (1,1 Km) MPW-W-240013 — 2024 Liquiçá Controlo de cheias HEZELDAN, UNIPESSOAL, LDA Em curso —
Emergency River Normalization and Construction of Gabion in Tunubibi SSS/066/MOP-2024 — 2024 Bobonaro Controlo de cheias Malilika Unipesoal Lda. Em curso —
Emergency River Normalization and Gabion Construction in Maumeta SSS/065/MOP-2024 — 2024 Liquiçá Controlo de cheias Metalika Unipessoal, Lda Em curso —
Emergency Stone Masonry Wall (Package I) "Gabion Works" Section 1 L=1012M, and "Cyclopean Concrete" Section 2 L=460M SSS/061/MOP-2024 — 2024 Dili Controlo de cheias Corcorcio Irloyvon, Lda Em curso 98%
Emergency Stone Masonry Wall Cyclopean Concrete Works Phase 1, Section 1 L=1265 m, and Krib Cyclopean Concrete Works L = 80 m at Dilor River MPW008 — 2024 Viqueque Controlo de cheias Zyah fast Unip lda Em curso 21%
Emergency Work For the Construction of Cyclope in Tibar River SSS/067/MOP-2024 — 2024 Liquiçá Controlo de cheias Felzuv Unip.Lda Em curso —
Gabion Wall Protection For Asumetaloa River MPW020 — 2024 Liquiçá Controlo de cheias Vicizabo Unip.Lda Em curso —