Provision of Consulting Services for Preparation of Detailed Engineering Design (DED) for New Bridges and River Training, Package/TOR No.2 Package I: New Bridges for Laclo Vila-Manatuto, Bemori-Dili, and Welolo (Existing Bridge) in Viqueque. Package II: River Training (Bridge Protection Structure) for Vemasse Bridge-Baucau, Wekain Bridge-Viqueque, Irabere Bridge-Viqueque and Dilor Bridge-Viqueque
La'o hela
Progresu70%
- Nú. kontratu
- MPW-CS-230001
- Kompañia
- JENETBI GUMER UNIPESSOAL, LDA
- Valór kontratu
- USD 800.511,25
- Setór
- Estudu no dezeñu
- Kategoria
- EST
- Nain
- Direcao Nacional de Prevencao e Controlo de Cheias
- Fonte fundu
- Liña Ministeriál (LM)
- Tinan
- 2022
- Data hahú
- 28 Dezembru 2022
- Data remata
- 27 Agostu 2023
Fonte dadus: SIGP — Sistema Informasaun Jestaun Projetu. Atualizasaun ikus: 9 Outubru 2026
La iha koordenada
Observasaun husi komunidade
Ita haree obra ne'e? Haruka observasaun ka foto kona-ba progresu. Ekipa MOP sei verifika molok publika.
