Bobonaro
MOP projects, alerts and contacts in each municipality.
- 84
- Projects
- 72
- Ongoing
- 11
- Completed
- USD 76.038.508
- Contract value
Road conditions
No active alerts.
Projects in this municipality
- Rehabilitation Of Jct. Balibo - Cova Posto UPF Derok Ren Road, Road Section : Jct Wefauk, derok Ren - Kolobili (Sta. 0+000-4+650), Bobonaro Municipality Flood control · Consorcio Wee Horis Fronteira Lda Completed
- New Installation MV, LV Line and House Connection from Fleixa to Nunumoge, Tatiri and Mulo - Ainaro Municipality Public buildings · Tuto Deni Unip. Lda Completed
- Rehabilitation of JCT Categral - Maliana - Etadai Roads ( Package I ) Sta. 1+150 - 3+150 ( 2.00 km ) Municipality Bobonaro Roads · IL Lilis, Lda Completed
- Provision of Consultancy Service for Preparation of Detailed Engineering Design (DED) and Bidding Documents for Rehabilitation of National Road: Maliana - Cailaco - Marobo Bridge (26 KM) Bobonaro Municipality (ICB-CS-MOP-22007) Studies and design · PT. Wiratman (Indonesia); JKC Consultant Engineering Unipessoal.,Lda Completed
- R4D Rural Road Rehabilitation Atu Aben-Liat Laun (Marobo) Chainage 0+000 - 2+000 Bobonaro Municipality Roads · Naroman Lifau Unip. Lda Completed
- Rehabilitasaun Estrada Rural,Atudara-Dau Udo Chainage, Bobonaro 0+000-2+000 (2.0 Km) Flood control · Carmo Unip. Lda Completed
- R4D Rural Road Rehabilitation Maliana - Saburai - Atus Chainage 0+0000-20+000 Flood control · IL THSUL LDA; KEFI OEL UNIPESSOAL LDA Completed
- R4D Rural Road Rehabilitation of Bobonaro- Fronteira- Aiasa Chainage 0+000-2+000 Bobonaro Municipality Flood control · Crescendo Unipessoal, Lda Completed
- R4D Rural Road Rehabilitation Of Atabae-Rairobo Road Package 6 Chainage 14+000-16+000 (2.0 KM), Bobonaro Municipality Flood control · Barver, Unipessoal Lda Completed
- Obra Konstrusaun Moru Protesaun, Gabion Mota Lotan (Package I Left Side, Sta. 0.+000 - Sta. 0+400) Aldeia Lotan, Suco Batugade, Posto Adm. Balibo, Municipio Bobonaro Flood control · Ely Karya Unip. Lda; Taloubo Leo Besi, Unip. Lda; Leo Atsabe Unp. Lda; Balibo Furak Unip. Lda; Fanesa Mor Unip. Lda; Leo Balibo Unip. Lda; Trimin Balis Silva Unip.Lda 100% Completed
- Konstrusaun Moru Protesaun Cyclope Mota Nunura Package II (Sta. 0+220 - Sta. 0+440) Suco Tapo/Memo, Posto Adm. Maliana Flood control · MALIANA BROTHERS, LDA Completed
- Mudansa Konstrusaun Linha Distribusaun Relasiona kondisaun Geografika Electricity · Gracia Timor Not started