Skip to main content

Project list

Contracted projects under way in Timor-Leste

906 results

Project list
ProjectMunicipality SectorContractor StatusProgress
Normalizasaun Estrada Nasional Tilomar-Fatumea, Municipio Covalima — Roads — Ongoing —
Normalizasaun Mota Halilaran - Ponte My Friend, Municipio Dili MOP-EO-25002 — 2025 Dili Flood control Marabia, Lda Completed —
Normalizasaun mota komoro (Fomento II) — Roads — Ongoing —
Obra 'Paint Side Walks (Goat Trotoar) from Estatua do Papa Joao Paulo II to Raikotu (Tasi-Tolu) Chainage 0+000 - 2+343. — Roads — Ongoing —
Obra Construsaun Drainagen (Precast), Sta. 0+000 - 0+150, Suco Metiaut, Posto Adm. Cristo Rei, Municipio Dili MOP-EO-25063 — 2025 Dili Flood control GSA COMPANY, Unipessoal, Lda Ongoing —
Obra Konstrusaun ba Manutensaun Estrada & Moru Protesaun iha Bubu-Susu, Sta. 0+009.87 - 0+036.19 & Sta. 0+157.63 - 0+170.84), Suco Bubu-Susu, Posto Adm. Faturbelio, Municipio Manufahi MOP-EO-25100 — 2025 Manufahi Flood control Darocabu, Unipessoal, Lda Ongoing 0%
Obra Konstrusaun ba Moru Protesaun ba Mota (Concrete Cyclope & Stone Mansory) iha Posto Integrado Fronteira Salele (Sta 0+000 - Sta 1+147) SSS/151/MOP-2025 — 2025 — Flood control — Ongoing —
Obra Konstrusaun ba Moru Protesaun Cyclope & Regularizasaun Pakote II, Mota Bedois, Camea, Aldeia Bedois, Suco Camea, Posto Adm. Cristo Rei, Municipio Dili MOP-EO-25023 — 2025 Dili Flood control Meteor Unip.Lda Ongoing —
Obra Konstrusaun ba Moru Protesaun Cyclope iha Mota Marak, Sta. 0+000 - 0+069.19, Suco Betano, Posto Adm. Same, Municipio Manufahi MOP-EO-25080 — 2025 Manufahi Flood control Builur-Udu, Unipessoal, Lda Ongoing 0%
Obra Konstrusaun ba Moru Protesaun Cyclope Mota Talimoro, Doenstream Rihht side Type A & Type B, Municipio Ermera, Sta. 0+000-Sta.1+388 (Type A) Sta.0+000-Sta.0+601(Type B) Package 1 Suco Talimoro, Posto Admintrativo Ermera SSS/014/MOP-2025 — 2025 Ermera Flood control Adenabilan Unip.Lda Ongoing 100%
Obra Konstrusaun ba Moru Protesaun Gabion sba Mota Sare Talimoro Sta. 0+000 - 0+520 (Right Side), Suco Asulau Sare Talimoro, Posto Adm. Hatulia B, Municipio Ermera MOP-EO-25038 — 2025 Ermera Flood control Oelau Buras Vetres Unip. Lda Ongoing 81%
Obra Konstrusaun ba Moru Protesaun Gabions ba Mota Sare Talimoro, Sta 4+480 - 5+264.79 (Right Side), Suco Asulau Sare Talimoro, Posto Adm. Hatulia B, Municipio Ermera MOP-EO-25026 — 2025 Ermera Flood control Andau Laulale Unip. Lda Ongoing 71%
Obra Konstrusaun ba Moru Protesaun Gabions ba Mota Sare Talimoro, Sta. 0+000 - 0+580 (Left Side), Suco Asulau Sare Talimoro, Posto Adm. Hatulia B, Municipio Ermera MOP-EO-25099 — 2025 Ermera Flood control Nate Unip. Lda Ongoing 85%
Obra Konstrusaun ba Moru Protesaun Gabions ba Mota Sare Talimoro, Sta. 0+520 - 1+060 (Right Side), Suco Asulau Sare Talimoro, Posto Adm. Hatulia B, Municipio Ermera MOP-EO-25037 — 2025 Ermera Flood control Rodi Dirlala 23 Unip. Lda Ongoing 80%
Obra Konstrusaun ba Moru Protesaun Gabions ba Mota Sare Talimoro, Sta. 0+580 - 1+180 (Left Side), Suco Asulau Sare Talimoro, Posto Adm. Hatulia B, Municipio Ermera MOP-EO-25027 — 2025 Ermera Flood control Blackbird, Unipessoal, Lda Ongoing 31%