Skip to main content

Project list

Contracted projects under way in Timor-Leste

906 results

Project list
ProjectMunicipality SectorContractor StatusProgress
Rehabilitation of Road JCT Luca, Raihun to Lacluta Dilor Sta. 7+000 - 13+922.67 km (Package II) Municipality of Viqueque — Roads — Ongoing —
Rehabilitation of Road Of Umaboco - Viqueque Demolition & Reinstallation Of Welolo Bridge, District Viqueque, Timor Leste (Reabilitasaun Ponte Welolo - Viqueque) — Bridges — Ongoing —
Rehabilitation of Road Section Remexio to Laclo Road Package II, Sta. 20+000 - Sta. 41+000, Manatuto Municipality — Roads — Ongoing —
Rehabilitation of Roads (A16) Jct. Tilomar (Sta 0+000) - Jct Fohorem (Sta 9+975) SSS/111/MOP-2025 — 2025 — Roads Consorcio Opiop Construction Unip Lda Completed —
Rehabilitation of roads Lautem - Raca - Trisula - Lospalos Municipality Lautem SSS/112/MOP-2025 — 2025 — Roads Vage'el Unipessoal, lda Completed —
Rehabilitation of the Warehouse and Construction of Counter of Laboratorio Nacional Obras Publica - MOP. — Roads — Ongoing —
Rehabilitation of Vila Maumeta-Beloi Sta 0+000-4+500 km, Atauro Municipality of Dili SSS/159/MOP-2025 — 2025 Dili Flood control Tinolina Unipessoal, Lda Ongoing —
Rehabilitation of Vila Maumeta-Beloi Sta 4+500 km - 10+717 km, Atauro Municipality of Dili SSS/161/MOP-2025 — 2025 Dili Flood control Tinolina Unipessoal, Lda Ongoing —
River Normalization from Hali Laran to Kuluhun (0+000 - 1+442) Dili Municipality. MOP-EO-25131 — 2025 Dili Flood control DSL2410CARDINIP Unip.Lda Completed —
Road & Paving Block Rehabilitation, Bench And Fences Concrete Left Side and Right Side, Sta.400m. Aldeia Fatu-Cama, Suco Metiaut, Posto Administrativo Cristo Rei, Municipio Dili — Roads — Ongoing —
Road Maintenance with Gabion Protection of Uatulari-Nunumalau, Nunumala, Viqueque Municipality — Roads — Ongoing —
Road Network Upgrading Sector Project: Road Link No. A08-04: Upgrading adn Maintenance of Lautem - Com Section: Sta.182+040 - Sta.201+800 (19.760 Km), Lautem Municipality — Roads — Ongoing —
Road Package A (Municipio Manufahi), National Road (Arterial A14) Same - Luak - Betano, L=9 KM (Part 1 - 5,1Km) SSS/142/MOP-2025 — 2025 Manufahi Roads Star King Unip. Lda Ongoing —
Road Package A (Municipio Manufahi), National Road (Arterial A14) Same - Luak - Betano, L=9 KM (Part 2 - 4.05 Km) — Roads — Ongoing —
Road Rehabilitation of Batugade Roads Package I Sta 0+000 - 8+000 8 KM SSS/120/MOP-2025 — 2025 Bobonaro Roads King Construction , Lda Ongoing —