Skip to main content

Project list

Contracted projects under way in Timor-Leste

769 results

Project list
ProjectMunicipality SectorContractor StatusProgress
Rehabilitation of Dili Urban Roads - Estrada Crusamento Taibesi (Dalan ba California & Mercado Taibesi) Municipio Dili. — Roads — Ongoing —
Rehabilitation of Ila - Has Ain Road Sta. 0+000 - 8+764.59 (8.764 Km) SSS/050/MOP-2024 — 2024 Covalima Roads Tatamero Unipessoal, Lda Ongoing 83%
Rehabilitation of Jct Ex. Kodim - Colegio Road SSS/041/MOP-2024 — 2024 Bobonaro Flood control Solideo Gloria Unip Lda Ongoing —
Rehabilitation of Municipio Roads Package 6 : Alas to Wedauberek Sta.0+000-23+000, Manufahi ICB/108/MOP-2022 — 2024 Manufahi Roads China Nuclear Industry 22ND Construction Co; LTD Ongoing —
Rehabilitation of Road and Drainage in Leber, STA 0+000 - 4+000 (Rehabilitasaun Estrada Rural pujuk leber ) SSS/032/MOP-2024 — 2024 Bobonaro Flood control Hugo Amor Unip Lda Ongoing —
Rehabilitation of Road in Jct. Fatuahi- Eis TVRI Lenuk Hun (4,5 KM), Sta. 0+000-4+5000 SSS/054/MOP-2024 — 2024 Dili Roads Ivander Junior, Unipesoal Lda Ongoing —
Rehabilitation of Road Jct Laclubar -Jct Soibada (Package I) SSS/057/MOP-2024 — 2024 Manatuto Roads Filhos Caldeiras Unip.Lda Ongoing 16%
Rehabilitation of Roads Kalmahein Borolau To Kulau-Sabraka Laran - Becora Sta. 0+000 - 3+833 (3.83) SSS/056/MOP-2024 — 2024 Dili Roads Island Orient, Unipessoal Lda Ongoing —
Rehabilitation of Roads Maubisse - Turiscain Phase III SSS/040/MOP-2024 — 2024 Ainaro Roads Montana Diak, Unipessoal, Lda Ongoing —
Rehabilitation Of Roads Section : Caicoli, Pantai Kelapa, Kampung baru Beduku, Bebonuk, Balide SSS/037/MOP-2024 — 2024 Dili Roads Mejori, Lda Ongoing —
Rehabilitation of Sarlala Road Protection Wall In Aileu Municipality SSS/189/MOP-2024 — 2024 Aileu Flood control Sali Magu Unipessoal Lda Ongoing 78%
Rehabilitation Road and Drainage Marconi, Aldeia 04, Suco Fatuhada, Sta. 0+000 - Sta. 3+224.27 SSS/122/MOP-2024 — 2024 Dili Flood control Lizi Construction, Unipessoal Lda Ongoing —
Rehabiltation and Normalization of Line Canal in Taibessi (Sta. 0+000 - Sta. 0+653) Suco Lahane Ocidental, Postu Administrativu Nain-Feto, Municipio Dili MPW-W-240040 — 2024 Dili Flood control Liberta Unipessoal Lda Ongoing —
Rekuperasaun Moru Protesaun Mota Ain Postu Integradu Batugede (Controlo de Cheias) MPW-W-230124 — 2024 Bobonaro Flood control Fortuna Star Unip Lda Ongoing 95%
Renovation of Cobe House of DNOF-DGAF-MOP in Caicoli, Dili MPW-W-240135 — 2024 Dili Public buildings Teki Lemos Unip.Lda Ongoing —