Rural Road Rehabilitation of Foho Ai Lico - Foho Bobe Chainage 0+000 - 2+000, Ainaro Municipality RT/005/MOP-2021 — 2022 Ainaro Roads DELONG UNIPESSOAL LDA Ongoing 92%
Rural Road Rehabilitation of Foho Ai Lico - Foho Bobe Chainage 2+000-3+500, Ainaro Municipality RT/006/MOP-2021 — 2022 Ainaro Roads Bermauana Unip. Lda Ongoing 91%
Rural Road Rehabilitation of Foho Ailico-Foho Bobe Chainage 3+500 - 6+000, Ainaro Municipality RT/007/MOP-2021 — 2022 Ainaro Roads Berdato Unipessoal Lda Ongoing 100%
Rural Road Rehabilitation of Foho AiLico-Foho Bobe Chainage 6+700-7+900, Ainaro Municipality RT/008/MOP-2021 — 2022 Ainaro Roads Haburas Sarai Unip Lda Ongoing 99%
Rural Road Rehabilitation of Lore - Tchai, Lore 1, Chainage 0+000 - 2+300 (2.3 Km) Lautem Municipality RT/105/MOP-2022 — 2022 Lautém Roads ZORRO CONSTRUCTION UNIP. LDA Ongoing 59%
Rural Road Rehabilitation Of Road Afaca-Uaitame Chainage 9+000-12+0000, Baucau Municipality RT/123/MOP-2021 — 2022 Baucau Roads Lia-Lura Unipessoal, Lda Ongoing 31%
Rural Road Rehabilitation of Uaguia - Nahareka Viqueque Chainage 7+400 - 9+400 Municipality Viqueque RT/032/MOP-2021 — 2022 Viqueque Flood control Fin Los unip.lda Ongoing 23%
Supply of Gabion Wire for River Protection for Prevention & Maintenance Project for 12 Municipalities. MPW-GS-220179 — 2022 — Flood control Ladiza Adiza JT Unip. Lda. Ongoing 94%
Water System Emergency Supply, Bee Mos Section 3, Dili and Aileu Municipality NCB/056/BTL-EP-2022 — 2022 — Water and sanitation Renaissance Unip.Lda Ongoing —
Engineering Procurement Construction-Design, Suplly, Installation, Testing and Commisioning Extension Transformer Bay Of The Existing 150/20KV Liquica Substation to Suplly Power to Tibar Bay Port ICB/053/MOP-2021 — 2021 Liquiçá Studies and design China Shandong International Economic Ongoing —
New Construction of Tower protection Wall No 92 Section Betano -Viqueque Manufahi Municipality NCB/028/MOP-2020 — 2021 Manufahi Flood control My FRIEND CONSTRUCTION, UNIPESSOAL,LDA Ongoing —
New Construction Of Wall Protection Tower No. 15, Section Maliana - Suai, Bobonaro Municipality NCB/027/MOP-2020 — 2021 Bobonaro Flood control Centeliziumen Unip. Lda Ongoing —
New Construction Of Wall Protection Tower No. 98 Section Liquica - Maliana NCB/031/MOP - 2020 — 2021 Bobonaro Flood control Nimia Lota Unip. Lda Ongoing —
Preparation for Detail Engenering Design for Dili Urban Road, Retender MPW-MOP-20002 — 2021 — Studies and design KIAT, UNIPESSOAL Ongoing —
R4D Rural Road Rehabilitation Genuali -Gololo Chainage, 7+000-8+500 Bobonaro Municipality RT/018/MOP-2021 — 2021 Bobonaro Flood control Sorte Nevis Unipessoal Lda Ongoing —