Skip to main content

Project list

Contracted projects under way in Timor-Leste

124 results

Project list
ProjectMunicipality SectorContractor StatusProgress
Cleaning Up Existing Demolished Buildings for Public Space Dili Urban (Crushed Parahanek, Bidau Pasar Sengol & B. Santana, Dili Municipality MOP-EO-25145 — 2025 — Roads DSL2410CARDINIP Unip.Lda Completed —
Laleia Realignment for National Road No. 1- Upgrading Project ( Manatuto -Baucau) Road Package A01-02 SSS/011/MOP-2025 — 2025 — Flood control Shanghai Construction Group Co.,Ltd; PT Brantas Abipraya Completed —
Normalizasaun Mota Halilaran - Ponte My Friend, Municipio Dili MOP-EO-25002 — 2025 Dili Flood control Marabia, Lda Completed —
Obra Konstrusaun Moru Protesaun Gabion ba Mota Nagidal, Covalima Pakote II, (Sta. 0+500 - Sta. 0+888), Suco Lour, Posto Adm. Zumalai, Municipio Covalima MOP-EO-25034 — 2025 Covalima Flood control ALFRANS' VAS, Lda Completed 100%
Projeto Emergencia - Normalizasaun Mota Hatsikun, Mota A3 Aidenu, Mota Lauala Gurbilala, Mota Fatuquero no Mota Lauala & Riheu Lufu, Posto Adm. Ermera, Posto Adm. Railaco Municipio Ermera MOP-EO-25146 — 2025 — Roads Sali Magu Unipessoal Lda Completed —
Rehabilitation of Roads (A16) Jct. Tilomar (Sta 0+000) - Jct Fohorem (Sta 9+975) SSS/111/MOP-2025 — 2025 — Roads Consorcio Opiop Construction Unip Lda Completed —
Rehabilitation of roads Lautem - Raca - Trisula - Lospalos Municipality Lautem SSS/112/MOP-2025 — 2025 — Roads Vage'el Unipessoal, lda Completed —
River Normalization from Hali Laran to Kuluhun (0+000 - 1+442) Dili Municipality. MOP-EO-25131 — 2025 Dili Flood control DSL2410CARDINIP Unip.Lda Completed —
Servisu Emergensia Normalizasaun ba Mota Komoro (Fomento I & Fomento II) Municipio Dili MOP-EO-25133 — 2025 — Roads Linatet Unipessoal Lda Completed —
Continuasaun of Gabion Box in Lela 2 Maukatar Covalima SSS/053/MOP-2024 — 2024 Covalima Flood control Consorsio Lakirin Gol Unip.Lda Completed —
Emergencia Konstrusaun Moru Protesaun Gabion & Groynes Mota Mola (Sta. 0+590 Km - Sta. 0+990 Km) R/S Suco Fatuleto, Posto Administrativo Zumalai, Municipio de Covalima MPW-W-2400076 — 2024 Covalima Flood control Jino Linda, Unipessoal, Lda Completed 100%
Emergency River Normalization and New Cyclope Wall Construction at Susan River Sta. 0+000 to 0+337.6 (0.337Km), and 0+000 to 0+718 (0.718 Km) Acanuno Hera, Administrativo Cristo Rei, Municipio Dili SSS/064/MOP-2024 — 2024 Dili Flood control Island Orient, Unipessoal Lda Completed 100%
Instalation of New Box Culvert at Baulela Suku Ogues, Postu Administrativo Maucatar, Municipio Maucatar, Municipio Covalima MPW-W-240006 — 2024 Covalima — Beiluasaur, Unip.Lda Completed —
Konstrusaun Moru Protesaun (Cyclope R/S & L/S, Slit Dam) Mota Camea Raihun Sta. 0+000 - Sta. 0+279 (R/S, L/S), Sta. 0+000 - 0+053 (R/S, L/S), Sta. 0+000 - 0+033 (R/S, L/S), Sta. 0+000 - Sta. 0+017 (R/S), Sta. 0+000 - 0+15 (L/S) Aldeia Ailok Laran, Suco Camea, Posto Adm. Cristo Rei, Municipio Dili MPW-W-240049 — 2024 Dili Flood control Youtejia Unip,Lda; Teofranci, Unipessoal, Lda Completed 100%
Konstrusaun Moru Protesaun Cyclope Mota Nunura Package II (Sta. 0+220 - Sta. 0+440) Suco Tapo/Memo, Posto Adm. Maliana MPW-W-240035 — 2024 Bobonaro Flood control MALIANA BROTHERS, LDA Completed —