Skip to main content

Project list

Contracted projects under way in Timor-Leste

187 results

Project list
ProjectMunicipality SectorContractor StatusProgress
Renovation of Cobe House of DNOF-DGAF-MOP in Caicoli, Dili MPW-W-240135 — 2024 Dili Public buildings Teki Lemos Unip.Lda Ongoing —
Review of the Detailed Engineering Design (DED) of MOP Office Building MPW-GS-240013 — 2024 Dili Studies and design KIAT, UNIPESSOAL Ongoing —
River Normalization and New Cyclope Wall Construction Lolessu River Sta. 0+000 to 0+600 (0.6 Km) CH-1 Package-II and Sta. 0+000 to 0+600 (0.6 Km) CH-2 Package II SSS/063/MOP-2024 — 2024 Dili Flood control SINAR SATELITE, UNIPESSOAL,LDA Ongoing 100%
Servisu Emergencia Normalizasaun Iha Mota Bekae, Dili Municipality MPW-W-240042 — 2024 Dili Flood control Liberta Unipessoal Lda Ongoing —
Upgrading Aimutin Urban Roads SSS/078/MOP-2024 — 2024 Dili Roads DILI UNITED CONSTRUCTION, UNIPESSOAL, LDA Ongoing —
Urban Road & Drainage Project At Unidade Especial Da Polisia SSS/030/MOP-2024 — 2024 Dili Flood control Montana Diak, Unipessoal, Lda Ongoing —
Construction and installation Green Corridor in Avenida Nicolau Lobato - In Front of Timor Lodge - Comoro MPW-W-230002 — 2023 Dili Urban development Aset Lda Ongoing —
Construction of New Bridge 70m, 2 Span Pre-Stressed Box Girder Double Cell, Be'e Mos River Casnafar, Dare, Municipality of Dili SSS/051/MOP-2023 — 2023 Dili Bridges Carya Timor Leste Lda Ongoing —
Construction Of Retaining Wall for Slope Protection at Becora Au-hun to Bidau Sagrada Familia, Package I ( Sta, 3+300 - 3+700 ) Dili Municipality ICB/122/MOP-2022 — 2023 Dili Roads Santana Diak Unipessoal Lda Completed 100%
Emergency Project Construction Of Retaining Wall For Slope Protection at Becora Au-hun to Bidau Sagrada Familia Package II (Sta. 3+700 - Sta. 4+134.44) ICB/123/MOP-2022 — 2023 Dili Roads Montana Diak, Unipessoal, Lda Completed 100%
Emergency Project For Rehabilitation Water Drilling Works In Capital Dili NCB/052/BTL E.P-2022 — 2023 Dili Water and sanitation Alifa Pereira, UNIPESSOAL LDA. Ongoing —
Manutensaun Monumento Iconia Sira Iha Capital Dili MPW-W-230136 — 2023 Dili — Eureka Gagas Utama, Lda Ongoing —
New Construction of Doctor House In Bidau MPW-W-230143 — 2023 Dili Public buildings XU SHENG CONSTRUCTION, LDA Ongoing —
New Construction of heavy equipment port area Hera, Municipality Dili IGEADI-031-CP-2023 — 2023 Dili — Nagi Unipessoal, Lda Ongoing —
New Construction of Jardim Tolerancia in kampung Alor MPW-W-230010 — 2023 Dili — Manu Bey Unip Lda Ongoing —