Project list

Contracted projects under way in Timor-Leste

906 results

Project list
ProjectMunicipality SectorContractor StatusProgress
Rehabilitation of Road and Drainage in Leber, STA 0+000 - 4+000 (Rehabilitasaun Estrada Rural pujuk leber ) SSS/032/MOP-2024 — 2024 Bobonaro Flood control Hugo Amor Unip Lda Ongoing —
Rehabilitation of Road in Jct. Fatuahi- Eis TVRI Lenuk Hun (4,5 KM), Sta. 0+000-4+5000 SSS/054/MOP-2024 — 2024 Dili Roads Ivander Junior, Unipesoal Lda Ongoing —
Rehabilitation of Road Jct Laclubar -Jct Soibada (Package I) SSS/057/MOP-2024 — 2024 Manatuto Roads Filhos Caldeiras Unip.Lda Ongoing 16%
Rehabilitation of Roads Kalmahein Borolau To Kulau-Sabraka Laran - Becora Sta. 0+000 - 3+833 (3.83) SSS/056/MOP-2024 — 2024 Dili Roads Island Orient, Unipessoal Lda Ongoing —
Rehabilitation of Roads Maubisse - Turiscain Phase III SSS/040/MOP-2024 — 2024 Ainaro Roads Montana Diak, Unipessoal, Lda Ongoing —
Rehabilitation Of Roads Section : Caicoli, Pantai Kelapa, Kampung baru Beduku, Bebonuk, Balide SSS/037/MOP-2024 — 2024 Dili Roads Mejori, Lda Ongoing —
Rehabilitation of Santana Bridge With System Bailey Bridge, in Dili MPW-W-240002 — 2024 Dili Bridges Eureka Gagas Utama, Lda Completed —
Rehabilitation of Sarlala Road Protection Wall In Aileu Municipality SSS/189/MOP-2024 — 2024 Aileu Flood control Sali Magu Unipessoal Lda Ongoing 78%
Rehabilitation Road and Drainage Marconi, Aldeia 04, Suco Fatuhada, Sta. 0+000 - Sta. 3+224.27 SSS/122/MOP-2024 — 2024 Dili Flood control Lizi Construction, Unipessoal Lda Ongoing —
Rehabiltation and Normalization of Line Canal in Taibessi (Sta. 0+000 - Sta. 0+653) Suco Lahane Ocidental, Postu Administrativu Nain-Feto, Municipio Dili MPW-W-240040 — 2024 Dili Flood control Liberta Unipessoal Lda Ongoing —
Rekuperasaun Moru Protesaun Mota Ain Postu Integradu Batugede (Controlo de Cheias) MPW-W-230124 — 2024 Bobonaro Flood control Fortuna Star Unip Lda Ongoing 95%
Renovacao de Casa de Recuperasaun da Saude para pessoas com HIV, Tibar, Liquica, Timor Leste MPW-W-240152 — 2024 Liquiçá — K Three Timorinsia Lda Completed —
Renovation of Cobe House of DNOF-DGAF-MOP in Caicoli, Dili MPW-W-240135 — 2024 Dili Public buildings Teki Lemos Unip.Lda Ongoing —
Review of the Detailed Engineering Design (DED) of MOP Office Building MPW-GS-240013 — 2024 Dili Studies and design KIAT, UNIPESSOAL Ongoing —
River Normalization and New Cyclope Wall Construction Lolessu River Sta. 0+000 to 0+600 (0.6 Km) CH-1 Package-II and Sta. 0+000 to 0+600 (0.6 Km) CH-2 Package II SSS/063/MOP-2024 — 2024 Dili Flood control SINAR SATELITE, UNIPESSOAL,LDA Ongoing 100%