Project list

Contracted projects under way in Timor-Leste

63 results

Project list
ProjectMunicipality SectorContractor StatusProgress
Konstrusaun Moru Protesaun "Gabion" Mota Mola Zumalai (Sta. 0+000 - Sta. 0+310.54), Aldeia Colu, Suco Fatuleto, Posto Adm. Zumalai, Municipio Covalima MPW-W-240051 — 2024 Covalima Flood control Leolico,Lda Ongoing 100%
Moru Protesaun Cyclope e Normalizasaun Mota Tasilin Zumalai - Suai, Suco Tasilin, Posto Adm. Zumalai, Municipio Covalima MPW-W-240010 — 2024 Covalima Flood control Lifran Unip. Lda Ongoing 100%
Obra Emergencia Normalizasaun Mota Nalaop, Zumalai, Aldeia Nalaop, Suco Fatuleto, Zumalai Municipio Covalima MPW-W-240038 — 2024 Covalima Flood control Tinolina Unipessoal, Lda Ongoing —
Rehabilitasaun Estrada Rural Beco - Halik STA 0+000 - 3+000 MPW-W-240134 — 2024 Covalima Roads Frafsang Uma Lafatik Unip. Lda Ongoing —
Rehabilitasaun Estrada Rural Beco-Halik STA 3+000-6+000 (3KM) Suco Beco, Posto Adm.Suai, Municipio Covalima MPW-W-240132 — 2024 Covalima Roads CASH, Unip.Lda Ongoing 52%
Rehabilitasaun estrada Rural, Beco Tobur II Sta. 6+000 - 9+000 km (3Km), Municipio Covalima MPW-W-240139 — 2024 Covalima Roads Lifran Unip. Lda Ongoing 90%
Rehabilitation of Approach Raiketan Bridge and River Slop Protection, Pakage II ., Suai Raiketan, Municipality of Covalima MPW-W-240107 — 2024 Covalima Flood control Antcarl, Lda Completed 100%
Rehabilitation of Ila - Has Ain Road Sta. 0+000 - 8+764.59 (8.764 Km) SSS/050/MOP-2024 — 2024 Covalima Roads Tatamero Unipessoal, Lda Ongoing 83%
Urgent Lo'omea River Protection Aligment II Left (sta. 0+600 - Sta. 1+200) MPW006 — 2024 Covalima Flood control Meteor Unip.Lda Ongoing 28%
Urgent Lo'omea River Protection Aligment III Down Right (Sta. 1+200-1+950 SSS/075/MOP-2024 — 2024 Covalima Flood control Super Jaya Unip.Lda Ongoing 80%
Urgent Lo'omea River Protection Aligment IV Down Left (sta. 1+250 - Sta. 1+850) SSS/076/MOP-2024 — 2024 Covalima Flood control Sanford Consruction, Unipessoal, Lda Ongoing 20%
Urgent Lo'omea River Protection Alignment I Right (Sta. 0+000 - Sta. 1+176) SSS/073/MOP-2024 — 2024 Covalima Flood control Montana Diak, Unipessoal, Lda Ongoing 50%
Installation of Wave Breaker (Concrete) to Protect Abutment Bridge & Regularization at Lomea River, Suco Tasihilin, Posto Administrativo Zumalai, Municipio Covalima. MPW-W-230028 — 2023 Covalima Flood control Fortuna Star Unip Lda Ongoing —
Konstruksaun Rekuperasaun Box Culvert , (Sta. 0+000 - 0+015) Retaining Wall (1-4), (Sta. 0+000 - 0+017, Sta. 0+000 - 0+013, Sta. 0+000 - 0+014 & Sta. 0+000 - 0+008) Suai Holbelis, Suco Labarai, Posto Adm. Suai Municipio Covalima RFQ-CD-MOP-22014 — 2023 Covalima Flood control JUFADO, UNIPESSOAL, LDA Completed 97%
Obra Construsaun ba Manutensaun "Box Culvert" Direccao Estrada Suai Maucatar, Cyclope L/S (Sta. 0+000-Sta. 0+038 Cyclope R/S 0+000-0+006, Matras Sta. 0+000-0+005 & Gabion (Sta. 0+000-0+019) MPW-W-230099 — 2023 Covalima Flood control HOLPILAT UNIPESSOAL LDA Ongoing 100%